| Projects |
|
  Here you will find different projects and maintenence on my Camaro Welcome back.
Projects and Maintenance 2009
20 Mars 2008. My secret little police light project is done, I always wanted to have this on the "show-offs" as a cool feature :) Picures on the install you find here >> Secret Project
19 Mars 2009. The new Transmission monut is intalled. Reason was that the old was little cracked adn caused a "klonk" sometimes when putting her into D from Reverse. Now its working like new again Pictures from the intall you find here >> Energy Suspension
20 Feb 2009. Power Distribution inside the car. This is also something I wanted to have, to connect new stuff, lights etc. Its good to have. Follow the install here >> Powerdist
Projects and Maintenance 2008
1 Juli 2008. I always wanted a fan controll, where I could start the fans whenever I wanted. Now I started the project :-). Follow the build here >> Fancontroll
1 Juli 2008. Today the new cooler bottle arrived. the old one wasnt that nice due its getting old and getting bad in color. So A new one is installed Click here to follow the change>> Water Bottle
24 April 2008. Then its time to change ignition lock cylinder, The cylinder was little loose and sometimes it was really hard to start, the change you can folow here >> Ignition Lock
13 Mars 2008. 3 Autometer gauges COBALT is bought to, Fuel pressure, Air/fuel ratio and boost/vacuum. Install pics and info will follow here >> Cobalt Autometers
13 Mars 2008. My new MSD 8.5mm spark plugs wires is here :) Follow the change of the wires here >> 8.5mm MSD
13 Mars 2008. My new MSD distributor has arrived :) This will make my engine idle and run like a champ again, having some problems with my stock distributor. This new one will fix that :) follow the change here >> MSD Distributor
13 Mars 2008. A new transmission mount and torquearm mount is bought, My old ones is bad and making some "klonk" sound sometimes so new ones has to be installed, follow the change here >> Tranny+torque mount
22 February 2008. Today I got my new ESC Module, I think its putting out false knock retard So I bought a new one just to make sure its working properly. The change of the ESC Module you can follow here >> ESC Module
22 February 2008. Bought a new Knock sensor because the old one dosent look so good (I think it putting out false knocks too, so and change is on the time) This project will be done later ~20 Mars maybe. So welcome back for this change.
19 February 2008. Finally I started to change all of my lamps in the car. always wanted LEDS instead of regular lights. (more light and less power consumption) The project can be followed here >> LEDs
12 February 2008. Went to the shop an bought an new Ignition switch, will install it and see if my starting problem goes away. I really hope I will find the problem soon . The Igniton Switch change you can follow here >> Ignition Switch
4 February 2008. Today I got my new dampers. I will change them later today some install pics and info you will find here -> Dampers.
Projects and Maintenance 2007
8 October 2007. Complete check of the engine, Fuel pressure, vacuum, compression test, Sparkkplug / wire check. and so on.. have alook. Full check.
21 September 2007. Just replaced the IAC motor.. hope it have any changes in the car.. IAC
14 Augusti 2007. New Hitatchi Mini-Starter is bought, The old one has given up.. So a new one is on the way. Follow the change here >> Ministarter 1,4 KW
29 Juni 2007. New MSD BLASTER COIL 48.000 Volts, installed, just to get a little more spark and power :) Please take alook at the pictures from the install >> MSD
29 Juni 2007. Lubrication of all of the axels. its always a good thing to do, I do it 1 time each year..
20 Juni 2007. New brakes on the front to, Its always good with new brakes around :) please check it out >> Brakes front
12 Juni 2007. Changing the brakes on the rear. Please take alook at them here >> Brake Rear
9 Juni 2007. Changed the motoroil and filter. So now almost all the fluids are new (not the coolant) but all oils. >> Oilchange
30 Maj 2007. Did one big service, Changed the oil and filter in the transmission (th700r4) and the universaljoints in the driveshaft and the fluid in the rearaxel.
23 Maj 2007. Bought on TPIS Airfoil, just for fun :).
14 Maj 2007. Ordered some new injectors, Accel 24 lbs/hr. One of my old ones has given up only got 5.5in resistence so its busted. New ones installed. Check out some info about the change here >> Injectors
7 Maj 2007. Then its time to change the TPS because it didnt get above 3 volts on WOT, and that not good, I tried to adjust it but it has given up... New one installed, check out som pictures here >> TPS
13 April 2007. Took a ride to Norrlands Custom (Örnsköldsvik-Sweden) and bought a new Lambda (o2) sensor, The old one didnt look to good. So a new one is installed, pictures and info here >> Lambda
3 Mars 2007. I have removed the Hoodinsulation and ordered a new from Classic Industries info and pictures are here >> Hoodinsulation.The old one was pretty bad and smelled funny :)
10 Februari 2007.
Mats Alfredsson Was on qiuckvisit and gave me some new things. Serpentinebelt and my mini IROC :) Info on the serpentinebelt change can you find here >> SerpentineBelt
7 Februari 2007.
And today I got my new Alternator CS130 105 AMP :). I will put it into the IROC later, pictures and info will come. You will find the pictures and install info here Alternator
19 Januari 2007.
Once again I got a package from the postman today it was a new engine oil filter and som engineoil. 8 valvecover bolts and valvecover sealing ValveCover.
Projects and Maintenance 2006
6 December 2006.
Today I got a package with the postman, it was an new ECM :) Opened it and checked the quality and it looked good. Pictures and info from the ECM change will you find here >> ECM
29 September 2006.
So, now the new chip is in place, The car runs GREAT. Have scanned it with TTS Datamaster to, and it looks good. I will take som more runs and logg the car. >> EPROM
28 September 2006.
My EPROM seems to have given up, So I have to take down the ECM and open it up do check it out. I have a new chip thats waiting to be installed into the ECM. >> ECM
8 August 2006.
Went to Norrlands Custom and purchased a new oil pressure sensor, because the old one seems to seen better days.
7 August 2006.
Today the postman came with a very nice package :) It came from my friend Mats from Umeĺ, 8 AC Delco sparkplugs and 8 sparkwires
2 August 2006.
The airfilter is now changed. Very easy job, Now the engine gets more air. Have a look under Airfilter
25 Jule 2006.
Just changed the rotor and distrubutor, went pretty well, one more thing to tick of the "TO DO list"some pictures and info under Rotor & Distrubutor
16 June 2006.
Me and my friend Mikael Rossander changed the fuel filter, the old one was plugged and didnt work to well... :(
24 April 2006.
I just uploaded som pictures from the install of Kenwood KDC-6031Y player.
Have a look. Welcome to leave a mark in the guestbook :).
16 April 2006.
I put some pictures and info from the installation and build of the sound system Amplifer, 6x9" speaker och Subwoofer.
11 April 2006.
I just purchased a Kenwood KDC-6031/Y MP3 player to the Camaro, Shall be installed 22 april
Projects and Maintenance 2005
17 May 2005.
Went to the store and buyed a new battery for the IROC-Z, I purchased a Exide - MAXXIMA the old one has died.
Project mini IROC-Z.
My friend Mats Alfredsson is building a 1:16 modell of an IROC-Z, He building a copy of mine :).
|
|
MENY
- Home
- Guestbook / Admin
- Links
- Back
NOTE
Not every project on this page is in English yet, Working on getting them on English. But you can look att the pictures, please check back and see if I had the time to translate the thing your want to read about, or contact me in the guestbook or email me if you have any questions.
|